PepsiCo Cork

This project incorporated the complete demolition of the existing concrete and steel structures at the decommissioned Swissco Factory and incorporated the removal and disposal of asbestos containing materials.

The existing buildings on site contained asbestos containing materials. The asbestos containing materials had been identified in the Refurbishment & Demolition survey.  The asbestos was removed on each individual area prior to commencement of demolition on that section of the particular building.

The soft strip out works comprised the removal of all internal non-structural items such as loose fixtures and fittings, shelves, racking, wall panels, brackets, floor finishes, raised floors, wall finishes, wall cladding, plasterboard faced and non-structural blockwork walls, cubicles, doors and frames, ceiling casings, suspended ceiling and mechanical/electrical/public health services as shown, back to the concrete frame/block work shell on each structure.

This was another project Tinnelly Group were proud to deliver.

Related projects

Demolition of Eircom Building, Dublin
Project

Demolition of Eircom Building, Dublin

Tinnelly Group undertook the demolition of the Eircom Building back in 2005, taking it down to basement level to facilitate new works.

Read More
Demolition and Asbestos Removal at Irish Cement.
Project

Demolition and Asbestos Removal at Irish Cement.

Demolition and asbestos removal of Irish Cement, Drogheda.

Read More
Irish Sugar Factory, Carlow
Project

Irish Sugar Factory, Carlow

Tinnelly Group where tasked with the demolition of the Irish Sugar Factory based in Carlow, this project required planning from both our asbestos and demolition...

Read More