PepsiCo Cork

This project incorporated the complete demolition of the existing concrete and steel structures at the decommissioned Swissco Factory and incorporated the removal and disposal of asbestos containing materials.

The existing buildings on site contained asbestos containing materials. The asbestos containing materials had been identified in the Refurbishment & Demolition survey.  The asbestos was removed on each individual area prior to commencement of demolition on that section of the particular building.

The soft strip out works comprised the removal of all internal non-structural items such as loose fixtures and fittings, shelves, racking, wall panels, brackets, floor finishes, raised floors, wall finishes, wall cladding, plasterboard faced and non-structural blockwork walls, cubicles, doors and frames, ceiling casings, suspended ceiling and mechanical/electrical/public health services as shown, back to the concrete frame/block work shell on each structure.

This was another project Tinnelly Group were proud to deliver.

Related projects

 
Tara Towers

Tara Towers

In 2019, Tinnelly Group carried out the site clearance, involving asbestos removal and complete demolition of the 7 storey, reinforced concr...

Read More
 
National Gallery of Ireland, Merrion Square, Dublin

National Gallery of Ireland, Merrion Square, Dublin

JTS were involved in major structural works at the National Gallery. As the building is a listed building the demolition works were extreme...

Read More
 
40 Molesworth Street Demolition

40 Molesworth Street Demolition

Works at Nr 40 Molesworth Street involved; · The complete strip out of an existing office block back to shell, · Various Asbestos remo...

Read More